** loadshedding during Sehr, Iftar - كوكو هندية

ryan

العودة   ryan > مواضيع منقولة من مواقع اخرى > موقع اجنبي > كوكو هندية

إضافة رد
 
أدوات الموضوع انواع عرض الموضوع
  #1  
قديم 05-17-2017, 07:12 AM
ahlam1399 ahlam1399 غير متواجد حالياً
Administrator
 
تاريخ التسجيل: Sep 2012
المشاركات: 3,727,761
افتراضي ** loadshedding during Sehr, Iftar

Industrial units won’t be supplied electricity from 5:00 pm to 4:00 am

ISLAMABAD: The federal government on Tuesday an**unced **t to carry out power loadshedding during Sehri, Iftar and Taraweeh prayers’ timings to provide some relief to the people from routine power outages during the holy month of Ramazan.

As the country is reeling from energy shortfall, the Ministry of Water and Power will continue loadshedding during the holy month with a little relief to those observing fast, a private TV channel reported.

According to the schedule an**unced by the ministry, industrial units would **t be supplied electricity from 5:00 pm to 4:00 am to manage the ever-increasing demand of power owing to soaring temperatures. Besides, the power utilities would **t carry out loadshedding at Sehri, Iftar and Taraweeh prayers timings.

The ministry in its statement said that the decision has been taken to facilitate general public in Ramazan in the wake of energy shortfall. Meanwhile, the power ministry has summoned the details of power load from the power distribution companies.



loadshedding during Sehr, Iftar

أكثر...

كلمات البحث

العاب ، برامج ، سيارات ، هاكات ، استايلات


رد مع اقتباس
إضافة رد


تعليمات المشاركة
لا تستطيع إضافة مواضيع جديدة
لا تستطيع الرد على المواضيع
لا تستطيع إرفاق ملفات
لا تستطيع تعديل مشاركاتك

BB code is متاحة
كود [IMG] متاحة
كود HTML معطلة

الانتقال السريع


الساعة الآن 07:51 PM


Powered by vBulletin® Copyright ©2000 - 2026, Jelsoft Enterprises Ltd. TranZ By Almuhajir
This Forum used Arshfny Mod by islam servant