Failure to reduce laodshedding duration angers PM - كوكو هندية

ryan

العودة   ryan > مواضيع منقولة من مواقع اخرى > موقع اجنبي > كوكو هندية

إضافة رد
 
أدوات الموضوع انواع عرض الموضوع
  #1  
قديم 04-28-2017, 05:51 PM
ahlam1399 ahlam1399 غير متواجد حالياً
Administrator
 
تاريخ التسجيل: Sep 2012
المشاركات: 3,727,761
افتراضي Failure to reduce laodshedding duration angers PM

Failure reduce laodshedding duration angers ISLAMABAD: Prime Minister Nawaz Sharif on Friday expressed his anger over the Ministry of Water and Power’s Failure to considerably reduce loadshedding duration in the country.

The prime minister was chairing a meeting of the Cabinet’s Committee on Energy here.

On the occasion, the secretary water and power briefed him on the demand and supply of power in the country.

Nawaz questioned that why the directions he had made in the previous meetings were **t being implemented.

The prime minister was informed that 866MW had been added to the national grid during the month of April while 400 megawatts would be added next month.

He tasked the secretary water and power to identify those responsible for the failure.

On the occasion, the prime minister directed for constituting a committee to monitor power supply on hourly basis.

He also sought weekly reports on production, supply and distribution of power.







Failure reduce laodshedding duration angers

أكثر...

كلمات البحث

العاب ، برامج ، سيارات ، هاكات ، استايلات


رد مع اقتباس
إضافة رد


تعليمات المشاركة
لا تستطيع إضافة مواضيع جديدة
لا تستطيع الرد على المواضيع
لا تستطيع إرفاق ملفات
لا تستطيع تعديل مشاركاتك

BB code is متاحة
كود [IMG] متاحة
كود HTML معطلة

الانتقال السريع


الساعة الآن 07:23 AM


Powered by vBulletin® Copyright ©2000 - 2026, Jelsoft Enterprises Ltd. TranZ By Almuhajir
This Forum used Arshfny Mod by islam servant