UAE?s Musanada says $1.4bn highway is 35% complete - اخر اخبار العولمة

ryan

العودة   ryan > اخر اخبار العولمة

 
 
أدوات الموضوع انواع عرض الموضوع
  #1  
قديم 08-31-2015, 05:34 PM
ahlam1399 ahlam1399 غير متواجد حالياً
Administrator
 
تاريخ التسجيل: Sep 2012
المشاركات: 3,727,761
افتراضي UAE?s Musanada says $1.4bn highway is 35% complete

UAE?s Musanada says .4bn highway is 35% complete


UAE?s Musanada says  src=Abu Dhabi General Services Company (Musanada) an**unced it has completed 35% of the 328km Al Mafraq-Al Ghweifat road project, worth .4bn (AED5.3bn). The road project, which will be completed by 2017, links cities of the Western Region, and seeks to ease traffic flow on the highway, state agency WAM reported. Eng. Faisal Al Suwaidi, director-general of main roads at the UAE's Department of Transport (DoT), said the DoT in partnership with Musanada has prepared the final designs of Al Mafraq-Al Ghweifat international road, a main land artery that links the UAE with neighbouring countries. Eng. Omer Al Mansouri, acting director of DoT's roads department at Musanada, said the government of Abu Dhabi is keen to boost the quality of infrastructure through approval and implementation of projects that support development, including Al Mafraq-Al Ghweifat road. RELATED ARTICLES: Roadwork-in-Jumeirah-starts-for-545m-Dubai-Canal , Taiwan-Saudi-road-construction-study-due-in-2017 , UAE-ministry-confirms-three-ongoing-road-projects ,

كلمات البحث

العاب ، برامج ، سيارات ، هاكات ، استايلات


رد مع اقتباس
 


تعليمات المشاركة
لا تستطيع إضافة مواضيع جديدة
لا تستطيع الرد على المواضيع
لا تستطيع إرفاق ملفات
لا تستطيع تعديل مشاركاتك

BB code is متاحة
كود [IMG] متاحة
كود HTML معطلة

الانتقال السريع


الساعة الآن 08:26 AM


Powered by vBulletin® Copyright ©2000 - 2026, Jelsoft Enterprises Ltd. TranZ By Almuhajir
This Forum used Arshfny Mod by islam servant