Dubai Electricity and Water Authority (DEWA) an**unced on Thursday that a consortium of Saudi Arabia's ACWA Power and Spain's TSK had been selected as the preferred bidder to build a solar power plant in the emirate. The utility's chief executive, Saeed Mohammed al-Tayer, also an**unced at a media event that the size of the plant, Phase 2 of the Sheikh Mohammed bin Rashid al-Maktoum solar Park, would be increased in size to 200 megawatts of generating capacity from the previous target of 100 MWs.